Double Stabilization VILLACARRILLO (Jaén)

Project

Double stabilization in Villacarrillo. 30 cm thick marl soil stabilised with Terrasil and lime + selected soil and cement.

Description

LOCATION
Villacarrillo (Spain)
BUILDER
Sacyr
LENGTH
10 KM
CONTRACT
Double stabilization
WORKING TIME
2 months
STATE
Finished